News

  • Grupo NIXTE

    Grupo NIXTE

    Van Triest Engineering is finishing-up the installation of the new pre-insulated transport line (TPL), and 5 Hectares of tube-rial crop heating.

    read more »
  • Tube Expanding machine

    Tube Expanding machine

    Van Triest Engineering GROUP has extend it's boiler services, with a state of the art tube rolling machine torque controlled.

    read more »
  • Finka Agropark

    Finka Agropark

    The Finka Greenhouse extension comes to it's end, and the young plants are to be planted. Next challenge to be finished the nursery/propagation area within a short time span.

    read more »
  • HFT Seeds Services

    HFT Seeds Services

    HFT Seeds services Guatemala has started there facility, Van Triest Engineering toke care of there boiler start-up.

    read more »
  • Netafim Mexico

    Netafim Mexico

    Van Triest Engineering makes a gentleman agreement with Netafim Mexico for total concept maintenance and sales for all there heating installations nation wide in Mexico.

    read more »
  • Agricola Maas

    Agricola Maas

    Verbakel-Bomkas starts 6 Ha. heating project at Agricola Maas
    Van Triest Engineering supplies total supervision, and local logistics.

    read more »
  • Wholesum Harvest

    Wholesum Harvest

    Van Triest Engineering is going to build a Heat Buffer from 4000 m3 for Wholesum Harvest. the project while take place in the mid of september.

    read more »
  • Green Valley

    Green Valley

    Hydroponic Green Valley builds a new plastic greenhouse of 49.200 m2 its a turn-key project realized by Verbakel-Bomkas.
    Van Triest Engineering provides for this project, technical supply, logistics (inside Mexico) of all materials and supervising for all technical installations.

    read more »
  • Alsa Alimentos

    Alsa Alimentos

    Alsa Alimentos is going to install the next generation of Priva Agro Automation, The Priva Connext together with a Nutriflex irrigation unit.

    Van Triest Engineering GROUP supplies and connects the complete installation.

    read more »
  • Grupo Lala

    Grupo Lala

    After installing a new burner with a Etamatic OEM and integrated CO/O2 control they want to upgrade there system with a data visualization module.

    read more »